Time-bin QKD: Difference between revisions
Jump to navigation
Jump to search
update list of equipment |
|||
| Line 25: | Line 25: | ||
|} | |} | ||
== Experiment Setup == | == Experiment Setup == | ||
=== Producing a short pulse === | |||
== Result and Discussion == | == Result and Discussion == | ||
== Conclusion == | == Conclusion == | ||
Revision as of 19:27, 6 October 2026
Team Members: Wang Ziyan, Wu Jinbin
Summary
The project is to implement time-bin QKD on the encoding and decoding ends.
Theoretical Background
List of Equipment
| Equipment | Manufacturers | Quantities |
|---|---|---|
| Function Generator AFG1022 | Tektronix, Inc | 1 |
| Oscilloscope HDO6104 | Teledyne LeCroy | 1 |
| NIM FAN-OUT Module | S-Fifteen Instruments | 1 |
| NIM Anti-coincidence Module | S-Fifteen Instruments | 2 |
| NIM cables | multiples | |
| BNC cables | multiples |